Submit appropriate application and if required, related plan (drawn to a measurable scale) and supplemental documents, in pdf format, electronically at https://actonline.saccounty.gov. Login or register for an account to log in. If you have questions regarding the portal, please contact Principal Building Inspector, Ryan Rudolph at rudolphr@saccounty.gov.
If you would like a step-by-step development assistant to determine appropriate plans, supporting documents and forms for your RESIDENTIAL submittal, use our Development Navigation Assistant.
Use our Development Navigation Assistant for a custom step-by-step printable guide to determine appropriate plans, supporting documents, and forms required for the permit process.
Yes, for certain Residential only applications. Permits can be applied for electronically and issued automatically when permit payment has been made. The following Residential applications can be automatically issued online:
Residential solar permit or solar with ESS using SOLARAPP (this is for contractor use only)
Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit.
This information is intended to be used as a general guide. When determining whether or not a building permit is required, refer to Section 105 of the California Building Code (CBC) and/or the California Residential Code (CRC) or consult directly with the Sacramento County Division of Building Permits and Inspection.
Projects that require a permit. Typical projects include, but not limited to:
Inspection scheduling options:
https://actonline.saccounty.net/CitizenAccess/
Next day inspection, if available, you must schedule by 5 p.m. the previous day.
To submit a revision to an issued permit, navigate to https://actonline.saccounty.gov/CitizenAccess/ and sign in. Once signed in, choose “Apply for Building Permit" and make selection under Commercial or Residential “Revision to Currently Issued Permit" and follow online prompts.
What You Need:
Questions regarding production home application submittal should be directed to BPIDProductionHomes@saccounty.gov.
Online Option:
Downtown Location:
Goethe Location:
Visit the Board of Appeals webpage.
Work cannot commence until a valid building permit accompanied by an approved, stamped plan and documents are issued.
A Special Inspection as herein required of the materials, installation, fabrication, erection or placement of components and connections requiring special expertise to ensure compliance with approved construction documents and referenced standards. Examples of items that would require a Special Inspection but not limited to would be Field Welding, High Strength Bolting, High Strength Concrete, Epoxy Anchors.
The easiest way is to use the automated inspection request system. To schedule an inspection for the next work day, you must schedule before 5:00 p.m. The system is available to callers seven days a week at 916 875-5296.
You must be a registered user and logged into your account to schedule inspections and select the correct inspection code.
Enter any special notes and a contact number and click the "Schedule Inspection" button.
No, We cannot schedule a specific time for your inspection. The inspector may be able to give you a window of time that he or she will be there. It is advised you call the inspector directly the morning of the inspection.
Home projects:
Commercial Projects may receive a signed Certificate of Occupancy.
At the time of inspection, have the following items available on-site:
Yes. As of January 1st, 2010 a permit is required to replace windows. This requirement includes both retrofit or cut in window and door replacement.
As of January 1st, 2011 all new one and two family dwellings require fire sprinklers.
All new homes need to be reviewed and approved by Technical Resources, LDSIR, Planning Department, Sacramento Sewer District. Other County Departments and Agencies may need to be contacted depending on the conditions on your parcel are Water Resources.
Technical Resources: dssgeneralinfovm@saccounty.gov
LDSIR: e-sips@saccounty.gov
Planning: sacplan@saccounty.gov
Sewer: permitservices@sacsewer.com