Scheduling an Inspection

Sacramento County offers three options to schedule an inspection

  1. Schedule Online

    Schedule online at https://aca-prod.accela.com/SACCO

  2. Schedule by Phone via the Relay IVR for Permits

    Dial (916) 875-5296

    Make a choice from the menu and enter the corresponding keypress

    • Press [1] to schedule an inspection 
    • Press [2] to cancel or reschedule an inspection 
    • Press [3] to check inspection results 
    • Press [0] to speak to department staff

     

    Follow the spoken prompts for entering your permit number, inspection code, and other details

  3. Schedule by Text via the Relay SelecTXT system

    Send a text to (855) 280-5383

    Enter one of the following into your text messaging app

    • “SCHEDULE” to schedule an inspection 
    • “CANCEL” to cancel an inspection 
    • “RESCHEDULE” to reschedule an inspection 
    • “RESULTS” to obtain inspection results

     

    Follow the interactive prompts for entering your permit number, inspection code, and other details.

    Schedule inspections in one text message with Express Commands:

    • To SCHEDULE an inspection, send: S [permit number] [inspection code] [date] [AM/PM] 
    • To CANCEL an inspection, send: C [permit number] [inspection code] 
    • To RESCHEDULE an inspection, send: RESCH [permit number] [inspection code] [date] [AM/PM] 
    • To CHECK RESULTS for an inspection, send: R [permit number] 

Inspection Codes

Combination

1 Combo 340, 101, 220

2 Combo 103, 356, 470

3 Combo 341, 342

4 Combo 104, 223, 344, 460

5 Combo 399, 350

99 Combo 199, 299, 399, 499

Structural

101 Footings

102 Slab on Grade/Gravel

103 Girders/Joists

104 Frame

105 Masonry Bond Beams

106 Tilt up Panel

107 Panel Closure

108 Roof Nail

109 Fire Walls

110 Shear Walls

111 Drywall Nail

112 T-Bar Ceiling

113 Stucco Scratch

114 Insulation

117 Draft / Smoke Curtain

118 Floor Nail

119 Slab on Deck

120 Disabled Access, Sdwk/Ramps

122 Window Flashing

123 Shear Wall, Hardware, Roof Diaphragm

124 Dry Pack

125 Vert Concrete Forms

126 Roof Pre-deck-Class A only

127 Shear-other

128 Roof - In Progress

129 Roof Frame

130 Fire Wall Nail

131 Re-Roof Overlay

132 Re-Roof Nail/Tear Off

133 Fire Walls/Caulking

135 Commercial Coach Setup and Support

180 Pre-gunite Structural

183 Pre-plaster Structural

195 Demo in Progress

199 Structural Final

Electrical

220 Ufer/Ground Electrode

221 Under Slab Conduit

222 Underground Service conduits

223 Rough Electric

224 Rough Walls

225 T-Bar Ceilings

226 Meter Connection

227 Electric Service Change

229 Construction Power

230 AG Pump

232 Light Standard Footings

233 Underground Conduits

234 Rough Soffits

235 Water / Gas Bonds

236 Rough Hard Lids

237 Panels / Transformers

238 Roof Electrical

280 Pre-gunite Electrical

281 Pre-gunite Electrical Conduits

282 Pre-deck Electrical

284 Electrical Service Drop

290 Misc Electrical

299 Final Electrical

Plumbing

340 Ground Plumbing

341 Sewer

342 Water Service

344 Top out Plumbing

345 Tub/Showers Hot Mops

346 Condensation- Indirect piping

347 Gas Piping

348 Rainwater Overflow piping

349 Backflow Protection

350 Water Heater

351 Solar Water Heater

352 Gas Pressure Test

353 Gas Tag number

352-353 are auto added together

356 Underfloor Plumbing

357 Gas piping/Test underground

380 Pre-gunite Plumbing

382 Pre-deck Plumbing

Plumbing Continued

384 Pool Heating

390 Misc Plumbing

399 Final Plumbing

Mechanical

460 HVAC Ducts

461 HVAC Equipment

462 Fire Dampers

463 Commercial Hood

464 Hood Shaft / Hood Duct

465 Gas Vents / Flues

467 Condensate Drains

468 Refrigeration Equip Piping

469 Cooking Equipment

470 Underfloor Ducts

490 Misc Mechanical

499 Final Mechanical

Combo Pool/Spa

501 Combo 580, 585

502 Combo 581, 588

503 Combo 582, 590

599 Combo 596, 597, 598

Standard Pool/Spa

580 Pre - Gunite

581 Pre - Deck Bonding

582 Pre - Plaster

583 Solar Pool Heater

585 Bonding Other

586 Conduits Other

588 Bonding Anchors Other

589 Electrical Service Drop

590 Disabled Access Required

596 Pool Final Plumbing

597 Pool Final Electrical

598 Pool Final Structural

Modular Homes

687 Mobile Home Set up Sup Sys

690 Com Coach Setup & Supp Sys

Moved Building

701 Foundation/Setback

711 Set Down - Underfloor Plumbing & Utilities

721 Moved Building Final